Friday, 17th Feb 2017 (8am - 5pm)
Between 8.00 and 10.30 a.m., as requested by Fam, I did a stock check for spare pumps and motors at the DPRS store room to collect all data. Then, Fam and I carried out the stock check for spare instruments, which are used in DPRS, in the Instrument Room. Those spare instruments, such as transmitters and switches, were in disorder, and we had taken up time to gather all instruments in one box. Later, I updated and completed the Spare Parts List of DPRS before emailing all three Spare Parts Lists to Fam and Tee for checking.
At 9.15 a.m., we had a daily review meeting with the operators.
At 10.00 a.m., I guided Vasu for strainer cleaning in the DPRS site. This task should be carried out when the internal pressure of the MBR feed pipeline is above 1.0 bar. At the same time, Leon had been here to monitor the MBR operation. He told me that he had detected several programming errors in the PLC system and Maurice would fix this problem at the end of February.
At 11.00 a.m., I went to the DAF site and asked Vasu about the air saturation system, as this system is crucial for an effective dissolved air flotation process. He had explained to me about the parameters to be monitored and adjusted. However, most of the settings were done by the process engineer during the commissioning stage. Later, I updated the SOP of the new DAF system by adding the section on the Air Saturation System in the Engineering office.
Between 3.00 and 5.00 p.m., I attended the second training session on Filter Press operation with Tee and Vasu. This session was mainly about the introduction of the HMI panel, maintenance of the filter press system, detailed operation and specifications. Each of us was given a copy of the operation manual, which includes all detailed information.
No comments:
Post a Comment