Saturday, February 25, 2017

End of Internship in Nestlé - 20th-24th Feb 2017 (8am - 5pm)

Monday, 20th Feb 2017 (8am - 6pm)

At 9.15 a.m., we had a daily review meeting with the operators. 

Between 11.00 a.m. and 12.15 p.m., Tee had called me to meet at the new DAF site and asked me about the procedure for operating the air saturation system. The condition of the water surface in the separator unit was unsatisfactory as certain parts were bubbling and other parts had insufficient air bubbles. We were adjusting the hand valves at air nozzles manually and observing the water surface so that all parts of the DAF unit are injected with numerous fine air bubbles. It took up time for Tee to troubleshoot this problem. 

At 12.30 p.m., Jaclyn asked me to help her monitor the MBR operation and ensure the recording is done by the operator.

Between 8.00 a.m. and 5.00 p.m., I continued to prepare the presentation slide. The slide contents include the projects I was involved such as the new DAF system and filter press. Then I emailed this file to Tee for checking. Meanwhile, I had sent one of my completed tasks, the WWTP flow diagram to Tee for checking as well. 

Tuesday, 21st Feb 2017 (8am - 5pm)

ON LEAVE 

Wednesday, 22nd Feb 2017 (8am - 5pm)

At 9.15 a.m., we had a daily review meeting with the operators as usual.

Between 8.00 a.m. to 2.30 p.m., I updated the SOP of filter press operation and emailed the completed files to Tee. 

Between 2.30 and 5.00 p.m., I continued to prepare and update my presentation slides. Tee had checked my final version of slides. 

Thursday, 23rd Feb 2017 (8am - 5pm)

At 9.15 a.m., we had a daily review meeting with the operators. 

At 10.00 a.m., we were in the meeting room to set up the venue for the presentation. The presentation session began at 10.30 a.m. when Mr Shinya, Head of the Engineering Department, was here. I was the first presenter, followed by Samuel and Yi Jie. Each of us had presented the projects involved and the tasks assigned during this three-month internship. There were Q&A sessions after our presentations. Then Mr Shinya gave a short speech and advice at the end of the presentation session. 

Between 1.30 and 5.00 p.m., I was tidying up all the belongings and obtaining the signature from the superior for approving some document in the Engineering office.

Process flow diagram of wastewater treatment plant

Friday, 24th Feb 2017 (8am - 5pm)

ON LEAVE

END OF INTERNSHIP
THANK YOU